If you own a tower crane or perhaps planning on hiring one, know the 6 important tower crane services you must invest in to ensure the optimal use of your equipment. These services will enhance safety, and help prevent unnecessary downtime as well as additional expenses.
Six Crucial Tower Crane Services
Site Planning – This is a very crucial
service as this helps you determine the suitable type of crane to use and where to
put it so you can get the best use out of it. It will entail the use of project
details, site address, the types of construction materials that must be used, architectural
drawings, general access details for the truck, and the profile of the location
for material handling.
Engineering of the Base – The right installation
of the crane and its base will contribute a lot to the eradication of safety
issues. Also, this will prevent expensive modifications later on. When it comes
to creating an excellent crane base design, it is very important to have the
structural drawings, geotechnical site specific information, architectural
drawings, and site specific surveys of the heights of surrounding buildings at
hand.
Installation and Commissioning Transport –
Before the delivery of the crane, the site must be surveyed against the site
plane, considering the location and the base design. The site must be prepared for
the work ahead. This means you should have properly coordinated with the right
authorities to adhere to the current regulations and to reduce disruption of
normal traffic. Also, an ample electrical power supply must be provided.
Moreover, personnel who aren’t involved with the task must leave the premises.
After its installation, the commissioning of the crane will begin – this will
entail a full test along with setting of the required overload limits and
following the specification and recommendations of the manufacturer. Once the test
and calibration is done, the crane will be verified as fit for use.
Operator Training – It is very important that
the operator must know how to operate the equipment safely. He must undergo a
full crane operation induction if he has not been trained on how to use a
specific remote control operated crane.
Maintenance & Servicing – Routine service
and maintenance must be done every 8-12 weeks to ensure the optimal performance
of the equipment. This service must be done without disrupting the project
schedule and must only be performed by trained personnel.
No comments:
Post a Comment